Yesterday I went to Harbor Freight to get a Riv-Nut tool. They only had the standard one, which I bought, but I think it's going to go back. Xero pointed out some nice tools on Amazon that are metric so at this point the plan is going to be put the bike together for GPR Camp, and then later when I have the proper tool I'll pull off the swing arm, and install the bobbin supports.
The cooling system is almost in place. Few more connections, and it will be ready for fluids. The radiator is a new unit, and to keep it looking nice I put a thin coat of paint on it.
For some reason I'm missing one of the spacers for the upper radiator mounts. So I took the throttle adjuster size insert, cut it down to fit. Worked out quite well. The bolt length for the clutch lever side is 5mm shorter, and should be a 40mm. I had 35, and 45 so I went with the 45, and will replace it with the proper length the next time I do a Bolt Depot order.
I learned that it's better to pull the over flow tank out to attach the small line.
While I had it out I interred the speed nut for the regulator—which is ready for installation, but it will be easier to install the horn first, and well the paint on the horn needs time to dry.
The rat's nest is getting better.
